The scope of supply included the provision of studies, configuration, parameterization, operating tests for EDP of the Protection Relays associated with the 2.4 MVA transformer, installed at the MCG mind for metal-Carregado Plant.
The supply includes the technical audit and coordination of studies protections in Elevatory Station Alenquer IV.
The scope of supply included the preventive maintenance tests of 30 kV and 6 kV equipment in the Alenquer IV Pumping Station.