The supply includes the provision of research services, configuration, parameterisation, testing and commissioning of a substation Mobile in Costa Rica with voltage levels of 230 / 34.5 kV, substation consisting of a command and control system EFACEC, ABB and EFACEC protection relays.
The supply includes the provision of training services in the X420 range equipment and in software of configuration Winprot 4.
The supply includes the provision of services commissioning of a command system, installed in substation, 220/132/11.5 kV of Kinyerezi.