DUBLIN SUBWAY

Client
Final Client
Country

Scope of Supply

The supply includes the provision of testing and commissioning of one RTU, comprising a traction transformer and the arrival (MT), including all part of DC and all internal signalling substation.

Overall System Architecture

System Description

In the settings and test was included the following equipment:

  • 2 2 UC 500E REDUNDANT EFACEC;;
  • CONTROL PANEL EFACEC;;
  • SWITCH PERIPHERAL ATEN;
  • 2 REDUNDANT SWITCHMOXA;
  • PC INDUSTRIAL ADVANTECH;
  • 6 SEPCOS NG integração;
  • 3 ABB 542 PLUS integração;
  • 3 ACQUISITION OF UNITS DCU 500 with inputs (8020), outputs (8050) and measures (8080) EFACEC.

Activity Description

The ENGIPROT team was responsible for the analysis of existing configurations of RTU and its adaptation to the features required by the customer.

In work the team ENGIPROT held all functional tests in the presence of supervisors of RPA under the coordination of EFACEC ENGINEERING.

Customer Benefits

With the inclusion of ENGIPROT in the team of commissioning tests EFACEC ensured a precise realization of commissioning tests, allowing the reducion of the final project completion.