ECP PAÇOS DE FERREIRA
Technical audit of protection system of Ikea Industry factory in Paços de Ferreira, Portugal.
Technical audit of protection system of Ikea Industry factory in Paços de Ferreira, Portugal.
The scope of supply included the provision of services of studies, configuration, parameterization, exploitation tests for EDP of the Protection Relay associated with the 400 kVA transformer, installed in the new Continente Bom dia-Santiago do Cacém.
The scope of supply included the provision of study, configuration, parameterization, and operational testing services for EDP for the Protection Relays associated with the 800 kVA and 1000 kVA transformer installed at the ETAR Quinta da Bomba-Corroios.
The supply includes providing services commissioning for the Protection relays associated to line 400 kV of the substation interconnection 400/60/30 kV of Moimenta da Beira to Substation 400/220/60 kV of Armamar the National Grid.
The supply includes the provision of research services, configuration, parameterisation, testing and commissioning of a substation Mobile in Costa Rica with voltage levels of 230 / 34.5 kV, substation consisting of a command and control system EFACEC, ABB and EFACEC protection relays.
The supply includes the provision of training services in the X420 range equipment and in software of configuration Winprot 4.
The supply includes the provision of services commissioning of a command system, installed in substation, 220/132/11.5 kV of Kinyerezi.
The supply includes the provision of services commissioning of a command system, installed in substation, 220/132/33 kV of Njiro.
The supply includes the provision of research services, configuration, parameterization, testing and commissioning of two substations in Paraguay with voltage levels of 230/ 24.3kV, substation consisting of a command and control system EFACEC, and protection relays Schweitzer SEL, in the 24.3kV existing will be implemented one Efacec command and control system for integration into HMI substation.
The scope of supply included the provision of configuration, parameterization, testing and commissioning services for 3 RTUs, composed of a capacitor bank, transformer reducers, and several outputs, installed in existing substations.