CADIZ SUBWAY

Client
Final Client
Country

Scope of Supply
The supply includes the provision of testing and commissioning of 13RTU, 4 associated with all substation, comprising a traction transformer and the arrival (MT), including all part of DC and all internal signalling to substation, the RTU remaining are responsible for the acquisition of data for stops (audio, video and ticketing).

Overall System Architecture

System Description

The settings and test was included the following equipment:

    • 1 UC 500E;
    • 1 SWITCH MOXA;
    • PC INDUSTRIAL ADVANTECH;
    • 3 SEPCOS NG;
    • 1 TPU 420S;
    • 4/5 TPU 420I;
    • 2 UNITS ACQUISITION BCU 500 with inputs (8020), outputs (8050) and measures (8080);
    • 3 Ase 2000.

In the settings and test was included the following equipment for STOPS:

  • PC INDUSTRIAL ADVANTECH;
  • 1 UNITS ACQUISITION BCU 500 with inputs (8020), outputs (8050);
  • 1 SWITCH MOXA.

Description of Activity

The ENGIPROT team was responsible for the analysis of existing configurations of RTU and its adaptation to the features required by the customer.

In work/factory the team ENGIPROT held all functional tests in the presence of supervisors of Andalusia, under the coordination of EFACEC ENGINEERING.

Customer Benefits

With the inclusion of ENGIPROT in the team of commissioning tests EFACEC ensured a precise realization of commissioning tests, allowing the completion of the project.