Technical audit of protection system of Ikea Industry factory in Paços de Ferreira, Portugal.
The scope of supply included the provision of services of studies, configuration, parameterization, exploitation tests for EDP of the Protection Relay associated with the 400 kVA transformer, installed in the new Continente Bom dia-Santiago do Cacém.
The scope of supply included the provision of study, configuration, parameterization, and operational testing services for EDP for the Protection Relays associated with the 800 kVA and 1000 kVA transformer installed at the ETAR Quinta da Bomba-Corroios.