DUBLIN SUBWAY
The supply includes the provision of testing and commissioning of one RTU, comprising a traction transformer and the arrival (MT), including all part of DC and all internal signalling substation.
The supply includes the provision of testing and commissioning of one RTU, comprising a traction transformer and the arrival (MT), including all part of DC and all internal signalling substation.
The supply includes the provision of configuration of parameters final, testing end-to-end of the line differential protection and supervision of Line Panel Protection System commissioning 400 kV Pedralva 2, encompassed by the contract for supply of the Switching Substation 400 kV of Vieira do Minho (REN), National Grid.
The supply includes the provision of configuration of parameters final, testing end-to-end of the line differential protection and supervision of Line Panel Protection System commissioning 400 kV Pedralva 2, encompassed by the contract for supply of the Switching Substation 400 kV of Vieira do Minho (REN), National Grid.
The supply includes the provision of research services, configuration, parameterization, and factory tests, with Protections Siemens for the rehabilitation of Hydroelectric Power Plants in Mavuzi and Chicamba, Mozambique, composed of two arrivals transformer and 3 outputs in Chicamba (22kV), 4 arrivals and 3 outputs in Mavuzi (6.6kV).
The supply includes the provision of testing and commissioning of 13RTU, 4 associated with all substation, comprising a traction transformer and the arrival (MT), including all part of DC and all internal signalling to substation, the RTU remaining are responsible for the acquisition of data for stops (audio, video and ticketing).
Commissioning support for K30 220/66/23 kV substation for ANDE, Ciudad del Este, Paraguay.
The supply includes the provision of protection coordination study for the extension of Matambo Substation, in Tete, Mozambique.
The supply includes the provision of research services, configuration, parameterisation, testing and commissioning of a substation Mobile in Morocco with voltage levels of 30/6.9kV, substation consisting of a command and control system EFACEC, and EFACEC protection relays.
The supply includes the provision of research services, configuration, parameterisation, testing and commissioning Protection Relays the Combined Cycle Power Plant, Luanda Refinery, connection of a 60kV line connecting the substation of Cacuaco, lines of 60kV interconnection between existing substation and new CCRL, two transformers of 60/11kV, two transformers of 11/15kV, 9 cells to 11kV and 5 cells to 15kV.
The supply includes the services of change tracking of parameterization, collection of installation elements for the analysis of incidents, audit of the command and control system and installed protection, and reporting with conclusions and suggestions for improvement.