The supply includes the provision of testing and commissioning of one RTU, comprising a traction transformer and the arrival (MT), including all part of DC and all internal signalling substation.
The supply includes the provision of configuration of parameters final, testing end-to-end of the line differential protection and supervision of Line Panel Protection System commissioning 400 kV Pedralva 2, encompassed by the contract for supply of the Switching Substation 400 kV of Vieira do Minho (REN), National Grid.
The supply includes the provision of configuration of parameters final, testing end-to-end of the line differential protection and supervision of Line Panel Protection System commissioning 400 kV Pedralva 2, encompassed by the contract for supply of the Switching Substation 400 kV of Vieira do Minho (REN), National Grid.